Monthly Archives: October 2013

Poured Floor

It’s another beautiful day here in the Poconos, and a great day to pour the cement floor in the lower level. We’re suppose to have rain the next couple of days and Mark said that’s perfect to let the cement … Continue reading

Posted in Uncategorized | Leave a comment

least we forget…

I don’t want anyone to feel neglected that is part of the “team” for building this house so here’s Fenkner….the port a pot people! I love the stuffed Hershey bar on the front of the truck. For some reason I … Continue reading

Posted in Uncategorized | 2 Comments

Waterproofing!

Today two workers are here from Tri State Foundation Waterproofing, Bullville, New York. They are spraying on a coating of Rub-R-Wall® Aqua Waterproofing which is a solvent free, all polymer coating which will provide a seamless membrane around the foundation wall. It can … Continue reading

Posted in Uncategorized | Leave a comment

Radiant is in the foundation floor.

Mark came over today and finished the Crete Heat, which is the green stuff, and then wound the plastic tubing for the radiant heat. Monday Tallman will be back and pour the concrete over all the tubing to create the … Continue reading

Posted in Uncategorized | Leave a comment

Radiant heat for foundation floor.

The forms are all down and some rough spots were smoothed out in the cement walls today. Then Mark started installing 2′ X 4′ green styrofoam squares that are dipped in green plastic that have flower shaped raised nubs. Sounds … Continue reading

Posted in Uncategorized | Leave a comment

The forms are coming down!

The guys from Tallman arrived bright and early again today and are taking down the forms to reveal are lovely solid cement foundation walls.  I know where I’ll be heading if there’s a tornado! Tallman is doing such a great … Continue reading

Posted in Uncategorized | 2 Comments

The big pumper trucks for cement.

The big pumper trucks came in today and then a steady stream of cement trucks to deliver the cement. It really is remarkable how it all works and I’m glad Rip was able to take some good shots since I … Continue reading

Posted in Uncategorized | 3 Comments

The big forms are all up!

The big forms are all up including for the garage and I just found out from Rip when he called that the big pumper truck is coming 7:00 Monday morning!  I’m bummed that I already agreed to work Monday subbing, … Continue reading

Posted in Uncategorized | 2 Comments

The BIG forms are going in!!

Tallman is here putting in the big forms that will be our basement. I’m so excited to hear we’ll have 9′ celling down stairs! The rain has held off today and it’s been a nice day for the guys to … Continue reading

Posted in Uncategorized | 2 Comments

Stone for the footers…

The footers are in and cured so next Dwayne (Cat Man Do), had to bring in tons of stone for around footers and bottom of foundation. Which is now all level and swept and ready for foundation forms for the … Continue reading

Posted in Uncategorized | Leave a comment